Part 89: Schedule Network Analysis
(Project Schedule Management: Develop Schedule)
- The Schedule Network Analysis is a technique to generate the project schedule model
- It uses techniques such as
- Critical Path Method
- Resource Optimization
- Modeling
- Aggregate
- We are reviewing the Schedule Network Diagram to figure out
- If we will have a schedule slip. A schedule slip could happen if we have convergence or divergence.
- If the critical path has high-risk activities or long lead times
- Schedule Network Analysis is iterative